Shanghai Songjiang Station is an important part of the Shanghai-Suzhou-Huzhou High-speed Railway. The overall construction progress has been completed at 80% and is expected to be opened to traffic and put into use simultaneously by the end of 2024. It is expanded northward on the basis of the original Songjiang South Station and will become the largest new station along the Shanghai-Suzhou-Lake High-speed Railway. The waiting hall of the new station building is an elevated waiting hall with 7 platforms and 19 lines. Together with the 2 platforms and 4 lines of the original Songjiang South Station, the total scale reaches 9 platforms and 23 lines, and the annual passenger flow is expected to reach 25 million. It is the third largest station in Shanghai after Hongqiao Station and Shanghai East Station.
Through high cooperation with full-process services and high-quality product quality, Shanghai SIWAY Sealant is the only sealant supply brand for integral facade curtain walls and roofs.
Post time: Aug-28-2024